100% Polyester Spunlaced Non-Woven Customized Printing Children's Protective Face Mask Fabric Making Machine

Customization: Available
Warranty: 1 Year
Application: Non Woven Fabric

Product Description

Protective Face Mask Fabric Making Machine

Basic Information

Model NO.
ZD
Automatic Grade
Automatic
Certification
CE, ISO9001: 2000
Customized
Customized
Condition
New
Meltig Point
164-170
Density
0.91
Melt Flow Index
35±5
Isotacticity
>96
Speed
30-140m/Min
HS Code
8449009000
Production Capacity
100sets/Year

Product Description

Undertaking projects:

non-woven machinery manufacture, pp spunbond nonwoven fabric

We offer a packing deal of spunbond production line, which includes the designing, producing, installing and testing (Turnkey projects).

Major characteristics:

The whole line is well-structured and easy to operate
The whole line highly automated
Control elements are of well-known make, high performance and reliable technologies
The whole line are controlled by PLC and operated with touch-screen
The allocation of the main frame and auxiliary equipment can be special designed and configurated according to customer's requirements
Machine Detail 1

Technical Specification

PP Spunbond Production Line Technical Parameter:

The TY of Die Effective width GSM Annual capacity Embossing pattern
11600mm10-250GSM1500TDiamond, oval, cross, and line
12400mm10-250GSM2400TDiamond, oval, cross, and line
13200mm10-250GSM3000TDiamond, oval, cross, and line
SS1600mm10-250GSM2400TDiamond, oval, cross, and line
SS2400mm10-250GSM4000TDiamond, oval, cross, and line

SMS Production Line Technical Parameter:

The TY of Die Effective width GSM Annual output Embossing pattern
SMS1600mm10-120GSM3000TDiamond, oval, cross, and line
SMMS3200mm10-120GSM6000TDiamond, oval, cross, and line

Company & Logistics

Company Profile
Packaging
Certifications

Frequently Asked Questions

Q1 How long will your engineer reach our factory?
Within one week after everything is ready (machine arrival at your factory, non-woven material, power source, air compressor, etc., prepared).
Q2 How many days will it take to finish installation?
We will finish the installation and training within 15 days.
Q3 How long is the machine's warranty period?
All our machines have a one-year guarantee for electrical parts and a two-year guarantee for the mechanism, starting from the completion of installation.
Q4 How do you handle broken parts within the warranty?
We provide express delivery of free replacement parts during the warranty period.
Q5 What service is provided after the one-year warranty period?
We still provide service support, but a daily salary for technicians will be required for the visit.
Q6 How are machine problems solved after the engineer leaves?
Generally, there are no issues post-installation. In case of any problem, our engineers will provide solution videos based on your description at any time.
Bottom Banner

Related Products