China Products/Suppliers. KN95 Facial Mask Non-Woven Fabric Making Machine

Customization: Available
Application: Non Woven Fabric
Automatic Grade: Automatic

Product Description

📊 Basic Information
Certification
CE, ISO9001: 2000
Customized
Customized
Condition
New
Meltig Point
164-170
Densiy
0.91
Melt Flow Index
35±5
Isotacticity
>96
Ash
<0.025
Speed
30-140m/Min
Production Capacity
100sets/Year
⚙️ Product Description

1.6M PP SPUNBONDED NON WOVEN FABRIC PRODUCTION LINE

Non-Woven Fabric Making Machine
Production Process: The production line adopts the technology of "slit negative pressure drafting".
Process Flow: Chip storage trough → Air conveying device → Screw extrusion melting → Filtration → Spinning air drafting → Netting → Hot rolling into cloth → Rolling.

PRODUCTION LINE TECHNICAL DATA:

Technical Parameter Value / Specification
Finished product width 1600 mm (effective width)
Maximum package diameter Φ1500 mm
Capacity (at 70 g/m2) 5 tons / 24 hours
Monofilament size S Less than 2.5 denier
Product weight 10 ~ 150 g/M³
Mechanical design speed 150 M/MIN (Actual: 130 M/MIN)

RAW MATERIAL REQUIREMENTS (PP Chips):

Project Index Unit
Meltig point 164-170 ºC
Density 0.91 g/m³
Melt flow index 35±5 g/10min
Molecular weight distribution <4 -
Isotacticity >96 %
🖼️ Production Line Gallery
🚀 Main Applications
Industry Application Products
Medical & Hygienic Operation clothes, masks, diapers, beauty products, sanitary towels, etc.
Household Packing cloth, curtains, table cloth, sofa cloth, mattress cloth, etc.
Daily Commodity Shopping bags, gift bags, advertisement bags, aprons, etc.
Garments & Shoes Work clothes, lining, clothing accessories, garment bags, etc.
Industrial & Agricultural Filtering material, insulating material, car interior cloth, roadbed cloth, etc.
Frequently Asked Questions
1. How long will the engineer reach our factory?
Within one week after the machine arrives at your factory.
2. How many days does it take to finish installation?
We will finish installation and training within 15 days.
3. What is the warranty period for the machine?
All our machines have a one-year guarantee, starting from the completion of the installation.
4. How are broken parts handled within the warranty?
We provide free replacement parts via express delivery during the warranty period.
5. Do the engineers speak English for communication?
Our engineers understand basic English and have over five years of international installation experience. They can also use body language and visual aids to communicate effectively.
6. How is the machine serviced after the warranty period?
We continue to offer technical services; however, customers will be responsible for the technician's daily service fee and related expenses.

Related Products