Disposable Medical Surgical Mask Manufacturer Non-Woven Fabric Making Machine

Customization: Available
Warranty: Support
Application: Non Woven Fabric

Product Description

Basic Specifications

Model NO.
ZD
Automatic Grade
Automatic
Certification
CE, ISO9001: 2000
Customized
Customized
Condition
New
After-sales Service
Support
Meltig Point
164-170
Densiy
0.91
Melt Flow Index
35±5
Speed
30-140m/Min
HS Code
8449009000
Production Capacity
100sets/Year

Packaging & Delivery

Package Size
500.00cm * 500.00cm * 500.00cm
Package Gross Weight
5000.000kg
Transport Package
Film Packaging

Product Description

1.6M PP SPUNBONDED NON WOVEN FABRIC PRODUCTION LINE

Production Process Route and Process Flow:

  • The production line adopts the technology of "slit negative pressure drafting".
  • Spunbond process flow: Chip storage trough -> Air conveying device -> Screw extrusion melting -> Filtration -> Spinning air drafting -> Netting -> Hot rolling into cloth -> Rolling.

Technical Data

  • Finished product width: 1600 (effective width)
  • Maximum package diameter: Φ1500MM
  • Capacity: calculated at 70 g/m2, 5 tons/24 hours
  • Monofilament size S: less than 2.5 denier
  • Product weight: (10~150)g/M3
  • Mechanical design speed: 150M/MIN; (actual production speed: 130 M/MIN)
  • Product quality standards: According to the samples and data confirmed by both parties.

Raw Material Requirements (PP Chips):

Project Index Unit
Meltig point164-170ºC
Densiy0.91g/m³
Melt flow index35±5g/10min
Molecular weight distribution index<4-
Isotacticity>96%
Wet<0.05%
Ash<0.025%

Applications:

Medical and hygienic: Operation clothes, masks, diapers, beauty products, sanitary towels, etc.
Household: Packing cloth, curtains, sofa cloth, mattress cloth, garde robe covers, etc.
Daily commodity: Aprons, shopping bags, gift bags, advertisement bags, etc.
Industrial & Agricultural: Filtering materials, roadbed cloth, dykes and dams cloth, waterproof rolling fabric.

Frequently Asked Questions

1. How long will your engineer reach our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. How long is your machine's warranty period?
All our machines have a one-year guarantee, starting from finished installation.
4. How could we do if the parts are broken within warranty?
We would express the free replacement parts during the warranty period.
5. Does your engineer understand English?
Our engineers understand some English and have more than five years of installation experience. They can also use body language to communicate effectively.
6. How do we solve machine problems after your engineer leaves?
In case of any problem, you can contact our sales at any time. Our engineer will provide a solution video based on your description.

Related Products